Requirement
Reading the request, purpose and available documents.

Licensing and regularization
Did you receive an accessibility requirement during the permit process? Acessibilize evaluates the condition of the property and defines the scope of the report based on the documents requested by the responsible body.
The right document starts with the right requirement: scope defined before inspection and issuance.
Direct answer
It is a technical document that records the assessment of the accessibility conditions of a building to support an operating permit, licensing or regularization process, as requested by the responsible body.
The work considers the existing conditions, the purpose of the process and the applicable technical requirements, including ABNT NBR 9050. The format of the document, the scope of the analysis and the information required need to be checked for each case.
Article 60, § 1, of Brazilian Inclusion Law links the granting and renewal of the operating license to the observation and certification of accessibility rules. This obligation should not be confused with the existence of a single model report or procedure for all municipalities.
The service serves owners, tenants, establishment managers and teams who need to understand or respond to an accessibility requirement in licensing.
If there is not already a formal requirement, one accessibility consultancy can help define the required assessment. For a diagnosis without a specific license purpose, also find out about technical accessibility report.
Delivery is a technical report prepared from the survey and analysis of the property. The proposal defines the scope of the work and the records that will integrate the document, such as:
Technical responsibility and registration corresponding to the activity must be defined with the qualified professional. In architecture and urban planning, the Registration of Technical Responsibility (RRT) is the responsibility of the architect or legal entity through their technical manager.
Get to know those responsible and the experience of Acessibilize. The participation of each professional and deliveries are established according to the nature of the demand.
To begin, inform the city, the address of the property, the activity carried out and the reason for the request. If available, please also forward:
These materials help define the scope, but do not replace the necessary technical survey. If there is any document missing, let us know what you have so we can assess the next steps.
Acessibilize is in Foz do Iguaçu, PR. Please provide the location of the property so we can check the service and inspection conditions. Talk to the team about your process.
Reading the request, purpose and available documents.
Definition of evaluated areas, deliveries and service conditions.
Survey and technical record of the conditions existing in the property.
Analysis of information and preparation of the document according to the findings.
Depending on the scope, the inspection may cover accesses, circulation routes, differences in level, ramps, doors, toilets, service areas and signage. The elements actually evaluated depend on the property and the purpose of the contract.
The report evaluates and documents. If barriers or non-conformities are identified, they need to be recorded in the analysis. The issuance of the document does not, in itself, transform an environment into an accessible one nor does it guarantee approval of the permit.
The project defines the solutions. When it is necessary to detail interventions, the architectural accessibility project has its own scope. One accessibility adjustment plan can organize intervention priorities.
Execution modifies the space. Works, adaptations and services accessibility adjustments need to be defined in specific contracting. Design, execution, administrative protocol and monitoring of the process should not be assumed to be included in the report.
The decision on the permit is up to the competent body and may depend on other requirements. If the demand also involves documents and conditions of regularity of the property, get to know the service property compliance and accessibility.
A standardized document should not be assumed for all processes. The obligation to observe and certify accessibility is provided for in federal legislation; The requested document, format and form of presentation must be checked with the body responsible for the case.
No. The report presents the technical evaluation. Approval depends on the analysis of the competent body, the conditions of the property and other requirements applicable to the process.
Photographs and plans help with the initial analysis, but do not replace technical verification of existing conditions. Survey and inspection needs are defined before hiring.
The findings must be part of the evaluation. It may be necessary to develop a project, plan interventions or make adjustments before meeting the requirement. Forwarding depends on the conditions verified and the process.
To define the value and deadline, it is necessary to know the location, area and complexity of the property, the scope of the requirement, the available documents and the inspection conditions. Also inform the administrative deadline received; it is not possible to promise a deadline for approval by the body.
Yes. A prior assessment helps to understand the property's situation and plan decisions about leasing, renovation or regularization. The scope must indicate whether the purpose is a general diagnosis or to meet a permit requirement.
See to Law nº 13,146/2015, especially article 60, and as CAU/BR guidelines on responsibility for RRT. Technical standards, including ABNT NBR 9050, must be considered in the edition applicable to the analysis.
For specific documentation of your process, please also consult the request and guidelines from the responsible municipal or sectoral body.
Have you received an accessibility requirement?
Inform the city, activity, type of property and available documentation to define the scope of the proposal.
Request review for permit